PL EN RU
Accomplished realizations

In Dalba, we’ve achieved numerous constructional and economic successes . Our accomplished projects include:

  • Reconstruction of the national road No. 65 along Ciołkowskiego and Baranowicka streets in Białystok – including storm drain, sanitary sewer and water supply systems.
  • Reconstruction of the of Mickiewicza and Świętojańska streets and Mickiewicza-Świętojańska crossroad
  • Construction of the storm drain channel with connections to the sewer line on the Mickiewicza street (on the section from Kilińskiego street), including storm drain, sanitary sewer and water supply systems with connections.
  • Construction of a shopping and service centre Biała in Białystok – including strom drain, sanitary sewer, water supply and permanent drainage systems
  • Modernization of the biological module of sewage treatment plant in Białystok
  • Construction of sanitary sewer system and water supply conduit with connections on the Kopernika street in Białystok
  • Improvement of the quality of public transport system in Białystok – Modernization of Produkcyjna street (on the section from Swobodna to Generała Stanisława Maczka street) – storm drains, rain gullies and connections.
  • Construction of a sanitary sewer system of Ostrołęka’s right bank and Olszewo-Borki municipality
  • Construction of a sanitary sewer system of Ostrołęka’s left bank in the Śródmieście and Wojciechowice area
  • Construction of Cementowa, Ekologiczna, Łodzińskiego and Świętej Kingi streets in Białystok
  • Reconstruction of Ciołkowskiego and Mickiewicza streets – on the section from Ciołkowskiego street to Białystok’s border
  • Reconstruction of the national road No. 8 on the Białystok – Katrynka section, including the construction and reconstruction of the necessary technical infrastructure
  • Development of the subzone of Suwałki Special Economic Zone in Białystok, including: construction of Myśliwska street on the section from KD-7L street to Borsucza street, construction of Solnicka street on the section from KD-7L street to Borsucza street and construction of KD-7L street with its necessary infrastructure
  • Improvement of the wastewater management in Łyse municipality – upgrading a sewage treatment plant and constructing of a pressure sanitary sewer system with sewer connections in Łyse.
  • Expansion of the national road No. 58 on the section between Szczuczyn and Warmian-Mazurian Voivodeship border, including its technical infrastructure
  • Construction of Z-4 sanitary collector in Białystok
  • Construction of a sanitary sewer leading to a Tołcze village
  • Reconstruction of the national road No. 8 running through Białystok. Reconstruction took place on Maczka street (on the section between interchange with Produkcyjna street and junction with 1000 – lecia Państwa Polskiego street), Generała Stanisława Maczka street (on the section leading to the Fire State Service building) and on the 1000 – lecia Państwa Polskiego street (on the section leading to Białystok’s border).
  • Reconstruction of a water supply network with connections in the area of intersection of Poleska and Sitarska streets with the rail crossing No. 37 – Zubki Białostockie
  • Construction of sanitary sewer and water supply networks with connections during the program of reconstructing Mazowiecka, Wiejska, Kawaleryjska, Pogodna, Kopernika, Wyszyńskiego, Waszyngtona streets in Białystok.
  • Construction and extension of a voivodeship road No. 671 including road engineering facilities on the Krypno – Tykocin section
  • Upgrade of a sewage treatment plant in Jaświły
  • Construction of a sanitary sewer system in Janowicze
  • Construction of a storm drain system on the Niska street
  • Construction of a storm drain system and storm gullies connection on the Narodowych Sił Zbrojnych street (on the section between Generała Kleberga and Komisji Edukacji Narodowej streets) in Białystok
  • Drainage of a rainwater from the area of Military Draft Office building and its roof – at Lipowa 35 Street in Białystok
  • Renovation and unclogging of drainage system in a service bulding at Malmeda 1 Street in Białystok
  • Construction of a storm drain system on a poviat road No. 1393 in Jurowce
  • Realization of a contract No. 8 from the “Extension and modernization of the water supply and sewer system in Białystok and the Wasilków municipality” Program.
  • Construction of a water supply conduit on Kijowska street’s extension (on the section between Młynowa and Legionowa streets) in Białystok.
  • Construction of the section of a water supply conduit with connections on Legionowa street in Białystok.
  • Construction of a storm drainage system on Generała Władysława Andersa street’s extension (on the section between Wasilkowska and Baranowicka streets) in Białystok.
  • Construction of a storm drain and water supply pipeline in a thermal-electric power plant in Białystok
  • Construction of a water supply network and sanitary sewer system on the Warszawska street in Białystok
  • Construction of a water supply network, including construction of main water duct and sections of water distribution ducts on Generała Władysława Andersa and 1 Armii Wojska Polskiego streets in Białystok, combined with disassembly of old water supply networks on the aforementioned streets.
  • Construction of a storm drain on the Generała Władysława Andersa street (on the section between junction with 1000-lecia Państwa Polskiego street and a junction with Wasilkowska street) in Białystok.
  • Construction of a DN600 main water duct and water distribution pipeline with connections on Generała Władysława Andersa street (on the section between Wasilkowska street and a junction with Piastowska street) in Białystok.
  • Construction of sanitary sewer network, main water duct and reconstruction of a water distribution network in the area of Wiadukt street and the extension of Sławiński street in Białystok
  • Construction of a sanitary sewer with gravity connections and network pumping stations with pressure pipelines in Porosły village
  • Construction and reconstruction of a voivodeship road No. 676 – upgrade of the junction in Supraśl
  • Construction of a 05 KDL street (on the section between 01KD-GP and 06 KDL streets), and 06 KDL street (on the section between Piastowska and 05 KDL streets) in Białystok, including technical infrastructure.
  • Construction of a gravity sanitary sewer and pressure duct with a sewage pumping station on Hetmańska street in Białystok
  • Development of unified, functional and effective public road network in Gródek municipality by improving connections of municipal roads No. 105020B, 105036B, 105036B and poviat road No. 1448B with a national road No. 65.
  • Reconstruction of a water supply network in Czajki
  • Modernization of a municipal sewage treatment plant in Sokoły.
  • Renovation of a sewage treatment plant in Narew
  • Reconstruction of a Leśna street in Kuźnica
  • Construction and reconstruction of a water supply, heat and sewage network and connections at the Białystok Waterwarks Company’s property at Młynowa 52/1 street.
  • Construction of treated wastewater drainage channels leading to the Biała river, within an existing drainage ditch of a sewage treatment plant at Produkcyjna 102 street in Białystok
  • Construction of a storm drain between J.K. Korzeniowskiego and Pozioma streets, combined with construction of a discharge outlet leading to a nearby ditch.
  • Construction of a sanitary sewer on the Sosnowa and Bajeczna streets in Zaścianki as a part of “Development and modernization of the municipal water and sewage system – stage III”
  • Construction of a sanitary duct with connections and connection chamber on Dziesięciny and Generała Józefa Hallera streets in Białystok
  • Construction of a water supply network and sanitary sewage network on the Owocowa and Miętowa streets in Białystok
  • Construction of a Pieczurki street in Białystok
  • Construction of a water supply network and sanitary sewage network on the Kolejowa street and its driveway in Białystok
  • Construction of a sanitary duct, main water duct and water supply conduit with reconstruction of water connections combined with demolition works on Plażowa street in Białystok
  • Reconstruction of Czysta street in Białystok
  • Construction of a water supply network and sanitary sewer with connections on the Diamentowa street in Białystok
  • Renovation of sanitary sewer with water supply and sewer connections and construction of water supply and sewer sections on Kołodziejska street in Białystok
  • Realization of a „Upgrading national road No.8 Warszawa – Białystok to the parameters of the expressway on the section between Wyszków and Podlaskie Voivodeship’s border” program. Section Ib – “Poręba” interchange, coordinates: 529+470,00 to 545+582,04 km. Length: 16,11 km
  • Extension of Sitarska street in Białystok (on the section between junction with Kozłowa street and junction with Świętokrzyska street) including construction of a two-level intersection and railway tracks in the direction of Kuźnica
  • Construction and reconstruction of Kodeksu Supraskiego, Rymark, Uroczysko and Pustelnia streets in Supraśl, including their necessary technical infrastructure, as a part of “Integrated Project: improving access to investment areas by Kodeksu Supraskiego street in Supraśl.
  • Construction and upgrade of Voivodeship road No. 682 on the section between Łapy and Markowszczyzna
  • Construction and upgrade of voivodeship road No. 685 with road engineering facilities and necessary technical infrastructure on the section between Zabłudów and Nowosady, including construction of Trześcianka’s and Narew’s bypass